Modern, Modular
Wind Tower
  Foundations  

AWARD WINNER

PTI-Header.png
1549592527058_edited.jpg

The RUTE BXG
Box Girder Precast Foundation

Operational since 2018 in MN, U.S.

" RUTE's innovative design reduces

the amount of concrete by 75 %.

That means, 75 % less CO2! '' 

The RUTE Team will provide you a budgetary estimate based on your wind farm site location, soil type/s, and tower load. We will provide your development team a lifecycle cost analysis report that quantifies the environmental and permitting benefits (like road use) and the value in offsite foundation manufacturing, the value of construction speed, and the value of long-lasting, reusable, assets.
                                                    

Prefabricated quality, speed, and savings.

IMG_0659%202%20copy_edited.jpg

RUTE BX field installation 2018

Bridging the Earth & Sky Video

STRONGER

windmill-blue.png

10,000 psi concrete

modern bridge methods

270 ksi steel PT strand = strength

Iron-icon.png

FASTER

faster-icon-clock.png
windmill-blue.png

Concrete arrives 28-day cured. Assembled in 3 days, staged for  efficient wind tower delivery schedule.

CLEANER

windmill-blue.png
co2-white.png

Half the concrete

2x the life span

75% CO2 savings over the wind farm lease.