top of page
Help RUTE run post-tensioning, and concrete interface trials at our shop in Marshall, MN. The load testing rigs entail 500 ton hydraulic jacks, and applying test loads to wind tower components. Lead and manage the detailing of the Mobile Precast Facility for various regions.
bottom of page